Search narrowed by:
Remove all filters
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/2017-final-report-international-class.pdf
electricity by SSE and their fixed term contract has come to an end but has not renewed it or given a termination notice. 18 Deemed contract rates are the rates charged by SSE to a business that is supplied e
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/an-evaluation-of-the-clean-sleat-project-2011-.pdf
ferry Source: Analysis by the author from household questionnaires Both, the ferry staff at Armadale terminal and the management of the bus company (Stagecoach in Skye and Lochaber) stated in personal interviews [...] be promoted for its initial purpose (being the linkage for people in remote villages to the ferry terminal and the main road so that they can use the bus) it would be more relevant, probably have a higher
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-transport-sector-in-rousay-and-eday-energy-cost-and-emissions-compared-to-kirkwall-2010-.pdf
part 3.1.1.4 and 3.1.1.5 Specific assumptions for Rousay: • Average distance from house to ferry terminal : 3.6 miles • Distance from Tingwall to Kirkwall : 15 miles • Full price of ferry ticket for passenger [...] centre. For Eday, the basic assumptions were as follows: • Average distance from house to ferry terminal: 4.1 miles • Distance driven within Kirkwall is 2 miles • Full price of ferry ticket for passenger [...] The weight of an unloaded 7.5 meter long lorry is 7 tonnes21 • The distance between Tingwall ferry terminal and Kirkwall is 13.5 miles.22 • The energy consumption per kg transported by the ferry between Tingwall
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/1.-eem-international-class-2015-achiltibuie-final.pdf
proposed site for the wind turbine is 5km away from the primary substation where the 33kV feeder terminates. To go ahead with this offer, CCDC through Coigach Wind Power Ltd. must therefore construct a 5km
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-of-renewable-energy-technologies-for-the-sustainable-development-of-the-isle-of-jura-2012-.pdf
Road construction and upgrade cost were obtained from the Forestry Commission, Scotland (2005). Terminal equipment cost (Aquatera Ltd 2005) Wind turbine generator Transformer 480V/33kV 3 phase disconector [...] 202km = 15,990£ 79,159£/km x 0.202km = 15,990£ 79,159£/km x 0.805km = 63,723£ Investment cost of terminal equipment (switchgears, transformers, etc.) and labour Construction and craneage 60,000 £ 60,000
https://www.science-story-telling.eu/fileadmin/content/projekte/storytelling/hintergruende/hintergrund-eng/hintergrund-nutrition-gb.pdf
8 Historical Background: Nutrition Storytelling Teaching Model: http://science-story-telling.eu termined that the white rice contained the germ that caused beriberi and that the red coating, which was
https://www.science-story-telling.eu/fileadmin/content/projekte/storytelling/zip/zip-eng/eijkman.zip
https://www.science-story-telling.eu/fileadmin/content/projekte/storytelling/geschichten/geschichten-pol/mendeleev-story-pl.pdf
zajmujących się produkcją serów, w dniu 17 lutego 1869 roku”. Tego było za wiele. Za kilka dni mijał termin złożenia w wydawnictwie kolejnego rozdziału jego podręcznika, a on nie wiedział jeszcze wedle jakiego
https://www.science-story-telling.eu/fileadmin/content/projekte/storytelling/zip/zip-eng/joule-2.zip
sensitivity, water is far from being at a constant temperature. Consequently, the procedure of de- termining this temperature is far from being easy. Instead of waiting until the mercury column of the thermometer
https://www.science-story-telling.eu/fileadmin/content/projekte/storytelling/hintergruende/hintergrund-eng/hintergrund-energie-gb.pdf