fileadmin/content/abteilungen/industrial/dokumente/downloads/veroeffentlichungen/diskussionsbeitraege/znes-diskussionsbeitraege-006-nutzen-des-klimaschutzes.pdf
Panel on Climate Change) (1996): Climate Change 1995 – Economic and Social Dimensions of Climate Change. Contributeion of Working Group III to the Third Assessment Report of the Intergovernmental Panel [...] (Intergovernmental Panel on Climate Change) (2001): Climate Change 2001: Mitigation. Contribution of Working Group III to the Third Assessment Report of the Intergovernmental Panel on Climate Change [B. Metz [...] Climate Change) (2007): Summary for Policymakers. In: Climate Change 2007: Mitigation. Contribution of Working Group III to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change [B. Metz
fileadmin/content/abteilungen/industrial/dokumente/downloads/veroeffentlichungen/diskussionsbeitraege/znes-discussionspapers-005-barbados.pdf
Systems (CSES) Energy- and Environmental Management Interdisciplinary Institute for Environmental, Social and Human Sciences Munketoft 3b 24937 Flensburg Internet: www.znes-flensburg.de Flensburg, January [...] highest around noon and lowest between midnight and the very early morning hours, before people start to work. As Figure 1 shows, the changes in the load, to which the production needs to adapt, are rather slow [...] investment can be produced on Barbados; like the foundations for the wind turbines or the construction work necessary for the pump storage hydro power plant. The higher the share of local production the lower
fileadmin/content/abteilungen/industrial/dokumente/downloads/veroeffentlichungen/diskussionsbeitraege/znes-discussionpapers-009-100ee-praslin-ladigue.pdf
(CSES) Energy- and Environmental Management Interdisciplinary Institute for Environmental Sciences, Social Sciences and Humanities Munketoft 3b 24937 Flensburg Internet: www.znes-flensburg.de Flensburg, March [...] Seychelles’ economy and private households as well as a major risk to the Seychelles’ future economic and social development. At the same time it is obvious that the Seychelles, together with the other small island [...] granite islands of Seychelles’ and a possible development towards a 100% renewable power supply. This work was done on invitation by the government of the Seychelles after a first discussion of the issue in
fileadmin/content/abteilungen/industrial/dokumente/downloads/veroeffentlichungen/diskussionsbeitraege/znes-discussionpapers-008-100ee-mahe.pdf
fileadmin/content/abteilungen/industrial/dokumente/downloads/veroeffentlichungen/diskussionsbeitraege/znes-discussionpapers-007-benefit-of-climate-protection.pdf
by Working Group II declines to deliver figures which are comparable to the costs of climate protection given by Working Group III (cf. IPCC 2014a, p. 450). On the other hand, the report by Working Group [...] sub-reports. While the report of Working Group III discusses and illustrates the costs of the different strategies for mitigating greenhouse gas emissions, and Working Group II also covers the adaptive [...] Emissions The IPCC predominantly quantifies the costs of climate protection in the report by Working Group III. The Working Group explicitly points out that the estimated costs do not include the benefits of climate
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/alumni/yb-2014-eem-ppre.pdf
professional work, Sebastian is currently pursuing his PhD on the role of energy in development processes, energy poverty and technical innovations. Previous to his work at MEI, Sebastian worked on the trading [...] (2014). She has worked as an Assistant Engineer in Geomax Consulting Engineers firm and as a Management Trainee with the East African Cables factory. Before her master course she worked as a Systems Protection [...] pursuing his Master's degree, for almost 2 years, Dishant worked as an Electrical Engineer designing Nuclear Power Plants. Currently, Dishant works for an Engineering, Procurement and Construction (EPC) company
fileadmin/content/projekte/vinorhm/dokumente/downloads/vinorhm-newsletter-2024.01.19.pdf
which I was also actually looking for in the hopes of finding someone who might be interested in working with mapping for the project, and it turns out Andre is not only interested in it, but he has since [...] .uni- flensburg.de/vinorhm We only managed a few archive trips, as much of the spring was spent working with the Ranzelberg Guestbook, but it has become one of the major sources we are using in this project [...] spanning from 1834-1888. Unfortunately, the guestbook is in pretty rough condition, which has made the work with it rather tedious, but we (along with two other student assistants, Ilka Thomsen and Jan Momme
fileadmin/content/abteilungen/industrial/dokumente/downloads/veroeffentlichungen/forschungsergebnisse/vernetzen-2016-endbericht-online.pdf
Organisationsformen im Energiebereich, 2014 (EnerLOG Working Paper). https://www.zab-energie.de/de/system/files/ media-downloads/EnerLOG%20Working%20Paper%201-7941.pdf [Bertelt 2015] Bertelt, Philipp: [...] e.de/de/system/files/media-downloads/EnerLOG%20Working%20Paper%201-7941.pdf https://www.zab-energie.de/de/system/files/media-downloads/EnerLOG%20Working%20Paper%201-7941.pdf http://www.bfe.admin.ch/th [...] Horbaty 2013] Huber, Stefanie ; Horbaty, Robert: Social acceptan- ce of wind energy projects. iea wind, 2013 http://www.socialacceptance.ch/ images/RP_14_Social_Acceptance_FINAL.pdf 200 http://www.bast.de/
fileadmin/content/abteilungen/industrial/dokumente/downloads/studiengang/uni-flensburg-meng-eum-selbstbericht.pdf
in question will be graded as 'Insufficient' (5,0). (5) Written work must be accompanied by a written statement confirming that the work was independently done, that all sources have been duly cited, and [...] and that only those sources cited have been used. If the work substantively violates the basic rules of scientific work, it may be given a failing grade for a minor offense. In particularly severe cases [...] gsorientierter Prozesse (roleplay workshop) - Project Management (group work and written exam) - Project Development (group work and presentation) - Integrierte Klimaschutzkonzepte (homework and presentation)
fileadmin/content/institute/physik/bilder-und-dokumente-aktuell/6-forschung/material-culture/ulbert-lena-the-magical-lantern-of-edgerton.-the-electronic-flash-tube-ge-ft-403.pdf
our experience of living” and “getting this relationship right will help us, finally, make history work for life” (Miller 2017, 20). By its definition, material culture is the study of material expression [...] case, timeless (Prown 1993, 17f). For the historian, the embodiment of the person who originally worked with the artifact, is the closest way possible to access the time, the person, or culture in question [...] valuable for the history of physics, since scientific instruments have been part of the scientific work from the time of the ancient Greeks and the gain of knowledge was enormous throughout the centuries