fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/potential-of-renewable-energy-in-the-north-harris-trust-area-2005-.pdf
Renewable Energy in the North Harris Trust Area SESAM 2005 – University of Flensburg, Germany vii A good start could be those households who showed interest to change their space or water heating system and with [...] future wind farms, hydropower plants and wave generators. Scottish and Southern Energy (SSE) has started the planning process to upgrade its transmission system and the cable connection to the mainland [...] islands as a test field. Communities can apply for funding for technical assistance, capital grants and start-up grants for renewable energy projects from SCHRI, the grants cover 50% of project investment up
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/present-situation-sustainable-energy-scenario-of-lochboisdale-up-to-2014-2009-.pdf
efficiency and expansion of renewable energy like wind, micro hydro, solar and tidal energy. As a starting point for the energy scenario the various secondary information like a feasibility study for a wind [...] extension project, some commercial and industrial facilities especially the fish processing plant will start operating by the beginning of 2012. Thus, after the completion of the harbor extension, the new fish [...] the micro-hydro plant (estimated capacity of 44kW) will be completed by the end of 2011 and it will start producing electricity from 2012. From this micro-hydro, the annual energy yield will be 200 MWh/y
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/an-evaluation-of-the-clean-sleat-project-2011-.pdf
the other means of public transport, in particular the busses and the ferry. This subsidy scheme started in 2010 and 118 travels have been registered as shown in Table 3-13. Table 3-13: Comparison of taxi [...] the 394 made compost which is 62% of all households in Sleat. 67 of these households (about 27%) started composting after 2008. This change could partly be attributed to the Clean Sleat Project since the [...] (February 2011). Robertson, Angus. BSCW. University of Flensburg. November 08, 2010. http://soraya.uni- flensburg.de/bscw/bscw.cgi/443483?client_size=1280x709#A297676_504387 (accessed March 12, 2011). Scottish
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/options-for-development-of-community-wind-energy-projects-in-the-north-isles-of-shetland-2007-.pdf
process and forwarding the relevant data to National Grid and the Transmission Owner. The process starts with the generator applying for a Connection and Use of System Code (CUSC) contract with the System [...] water storage as grant to customers 2) To find the critical investment cost which makes the project starts to become infeasible Remark: *turbine cost is the proportional from ₤3,692,406 investment cost of
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/community-development-projects-for-the-supply-of-heat-and-electricity-from-renewables-in-the-isles-of-barra-and-vatersay-2009-.pdf
Information about Fish Factory Barratlantic is built on croft land within Ardveenish area. The factory started back in 1974 mainly to process fish meal. In 1990‟s, the management of the factory changed hands [...] back-up shift. The regular shift runs from 8:30 am to 5:00 pm from Monday to Friday. The Back-up shift starts from 3:00pm to a round 9:00Pm. The main duty of this shift is to receive fish from the fishing boats [...] give an annual electricity consumption of about 591.47MWh. The analysis reveals that the high season starts from the month of May running through to September giving an average daily demand of 2232.92 kWh
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2016-the-assessment-of-renewable-energy-projects-for-community-benefit-in-west-harris.pdf
West Harris. To access these benefits, the community needs to adopt new and innovative solutions to start up, scale up and roll-out renewable energy projects within its boundaries. Page | 5 3 Methodology [...] micro hydro projects, Gleann Dubhlinn is the one which has already been planned and is expected to start in the summer of 2016. The catchment area of this scheme is around 5 km2 in size and is located to [...] 2016 the sale price of electricity (Export Tariff) will increase to 4.91p/kWh. As WHT has already started ordering parts with lead-in time, we assumed that the scheme will be installed by 23rd September
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/1.-eem-international-class-2015-achiltibuie-final.pdf
turbine. Enercon 44 has a rated power output 900kW. Power generation starts from 3m/s cut in wind speed and maximum power output of 910kW starts from wind speed 17m/s up to 25m/s. The cut out wind speed of the [...] turbine. Enercon 44 has a rated power output 900kW. Power generation starts from 3m/s cut in wind speed and maximum power output of 910kW starts from wind speed 17m/s up to 25m/s. The cut out wind speed of the [...] include specific policy for a certain form of development such as a wind turbine and hydro scheme, the starting point in the consideration of applications for that type of development should be with that policy
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-of-renewable-energy-technologies-for-the-sustainable-development-of-the-isle-of-jura-2012-.pdf
support the development of renewable energy projects. As such, this report should be viewed as the start of an ongoing set of activities and discussions about renewable energy developments rather than being [...] methodology The methodology employed to meet the objectives was to continue with desk studies which were started in Flensburg, to gain insight into the existing situation. This involved a review of previous work [...] energy yields at the Ardlussa sites. In addition, a qualitative household survey was conducted at the start of the study to determine the community‘s acceptance of the proposed wind project. The study considered
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/integrating-renewable-energy-technology-for-heat-demand-and-a-hydrogen-economy-for-unst-ic-2019.pdf
web-based open link (https://evasys.uni-flensburg.de/evasys/online/) with one password (unst2019), and the Appendix Figure I-1 EvaSys Software Logo https://evasys.uni-flensburg.de/evasys/online/ I-2 other [...] 2014-15 as 316.34 kWh/m2, 315.02 kWh/m2, 274.83 kWh/m2 and 290.29 kWh/m2 respectively with the years starting from April to March. The building is primarily floor heated and kept at around 20 oC by two Falcon [...] Forecasting (WRF) on hourly bases with small spatial resolution and is provided for three years starting from October 2015 to October 2018 (EMD International, 2019). The location of the generated metronomic
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/a-leap-towards-energy-sustainability-for-loope-head-communities-2020.pdf
the University of Flensburg carried out different pre- feasibility studies to ascertain a possible starting point towards a sustainable energy community. Different sectors where under scope of research namely; [...] passenger trips which can be increased if tourists use the public transport. If an electric minibus is started as public transport, it will have lower fare as compared to diesel bus. If there is a demand of 6000 [...] electricity is going to be valuable and important as planned Government increases in carbon taxes start to bite (Agriland, 2020). The scheme, which is under the Department of Agriculture food and Marine