fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/options-for-development-of-community-wind-energy-projects-in-the-north-isles-of-shetland-2007-.pdf
connected to Scotland Mainland grid while Shetland is not. Therefore, the realisation of Shetland RPZ project will not likely to happen in the near future unless the connection to the Scotland Mainland is built [...] IN SHETLAND 2.1. WIND ENERGY GENERATION PROFILE Shetland has one of the greatest wind energy potentials in the world. From The Shetland Statistics for 2004 and 2005 published by the Shetland Island Council1 [...] Ltd, David Thomson of Shetland Renewable Energy Forum, George Smith and Terry William of Shetland College, Neville Martin of Shetland Heat and Power Ltd., William Spence of Shetland Energy Recovery Plant
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/community-development-projects-for-the-supply-of-heat-and-electricity-from-renewables-in-the-isles-of-barra-and-vatersay-2009-.pdf
were assumed to be £26,000 T&D? A price of £3000 per kW was considered for the turbine of 20 kW and a price of £2500 per kW was considered for the 50 kW option The power curve for the AOC 15/50 (Model AOC [...] for wind2heat options. Description Option 1 Option 2 Option 3 Wind turbine capacity 50 kW 20 kW 40 kW (2x20 kW) Investment wind turbine (£) 125,000 60,000 120,000 Investment distribution (£) 26,000 26 [...] By applying this assumption, the baseload for the high season shifts to 57kW (40kW*1.42) and peak load shifts to 256kW (180kW*1.42). Figure 30 shows a typical load profile for a busy day in both high and
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/present-situation-sustainable-energy-scenario-of-lochboisdale-up-to-2014-2009-.pdf
Community Energy Scotland (CES) requested Sustainable Energy System and Management (SESAM), University of Flensburg, Germany to conduct energy related study in Lochboisdale, Outer Hebrides, Scotland. The seven [...] other fuels are also imported from mainland, except locally available peat, the additional delivery cost is making the fuel prices in Lochboisdale higher than on the mainland. Detailed electricity unit prices [...] 3p/kWh. South Uist area has excellent wind energy potential with an identified capacity from 850 kW to 14,000 kW. The mean wind speed in South Uist is estimated around 8 to 12 m/s at 75 meters height 38 . The
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/1.-eem-international-class-2015-achiltibuie-final.pdf
after Dec. 2012 Wind turbine 100kW < WTC ≤ 500kW Downrated E44 (500kW) Eligibility date 2 13.55 p/kWh 12.05 p/kWh 4.85 p/kWh V 29 Eligibility date 2 500 kW < WTC ≤ 1500kW E 44 Eligibility date 2 7.36 p/kWh [...] generations (900kW + 420kW) does not exceed the 600kW limit allowed by the operator at the connection point. Should combined generation exceed 600kW, the community must ensure a maximum of 600kW is fed into [...] Coigach Wind Power Ltd.: Installation and operation of an Enercon E44 900kW (WTN 500kW/Downrated E-44 500kW or Vestas V27 225kW) wind turbine for grid feed-in and supplying electricity to a district heating
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/the-ecological-footprint-of-the-sleat-peninsula-2008-.pdf
Division Woodlands, “Land Cover Scotland project”, 2002 Built land in Sleat Highlands and Islands Enterprise, Community land unit, “Ordnance Survey Strategy Small Urban Areas”, 2007 Cropland in Sleat Skye [...] Fort William. Highlands and Islands Enterprise, Community land unit (2007): Ordnance Survey Strategy Small Urban Areas, Highlands and Islands Enterprise, Scotland. Highlands and Islands Enterprise, Community [...] atlas”, p.137 Inland water in Sleat Highlands and Islands Enterprise, Community land unit, “Ordnance Survey Strategy Inland Water”, 2007 Sea land of Sleat Derived from “Best Foot Forward Island State – An
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/ic-2016-the-assessment-of-renewable-energy-projects-for-community-benefit-in-west-harris.pdf
160 180 0 0,1 0,2 0,3 0,4 0,5 P o w e r kW / E n e rg y M W h Design flow (m³/s) Power Energy 0 50 100 150 200 250 0 0,1 0,2 0,3 0,4 0,5 P o w e r kW / E n e rg y M W h Design flow (m³/s) Power Energy [...] assessed in this site as follows: Scenario 1: 100kW hydro and 100kW wind turbine Scenario 2: 100kW hydro with storage and 100kW wind turbine Scenario 3: 100kW hydro with storage and a larger wind scheme to [...] Scenario III: 100 kW Hydro + 200 kW Wind (2 x 100 kW Xant M-21) 7.7.1 Energy Assessment Under the current FIT scheme the same electricity price is paid for projects between 100kW to 1500kW. A third scenario
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/assessment-of-renewable-energy-technologies-for-the-sustainable-development-of-the-isle-of-jura-2012-.pdf
for 50 kW, 100 kW and 330 kW with their optimum penstock size and also with a larger penstock compatible with 330 kW capacity to allow for easy and less costly plant capacity extension of 50 kW or 100 kW [...] extendable to 330 kW in future) 100 kW hydropower plant with optimum penstock size 100 kW hydropower plant with larger penstock size (plant extendable to 330 kW in future) 330 kW hydropower plant with [...] 50 kW are shown in Figure 4-9 and Figure 4-10. 0 50 100 150 200 250 300 350 876 1752 2628 3504 4380 5256 6132 7008 7884 8760 P o w e r kW Hours Annual Power Duration Curve Power 330 kW Power 100 kW Power
fileadmin/content/abteilungen/developing-countries/dokumente/downloads/international-class/potential-of-renewable-energy-in-the-north-harris-trust-area-2005-.pdf
GBP = Great Britain Pound GSHP = Ground Source Heat Pump HICEC = Highlands and Islands Community Energy Company HIE = Highland & Island Enterprise IRR = Internal Rate of Return LECs = Levy Exemption C [...] Energy System in Scotland and the Western Isles 2.1 Status of Renewable Energy in UK and Scotland The following figure shows that the nuclear is the major source of energy in Scotland. Among the renwable [...] through different institutions and programs like Highlands & Islands Enterprise (HIE) and its Community Energy Units, Western Isles Enterprise (WIE), Scotland Community and Household Renewables Initiative
fileadmin/content/seminare/medienbildung/bilder/filk/2013-07-17-filk-bibliografie-deutsch.pdf
Deutschen Gesellschaft für Psychologie: Pro- gramm und Abstracts. Landau, 9.-11. September 2001. Landau: Universität Koblenz- Landau, Abteilung Landau: Institut für Kommunikationspsychologie / Medienpädagogik [...] Stuiber. Medien in Deutschland, Band 2: Rundfunk, 1. Teil: Zum Rund- funkbegriff, Rundfunktechnik, Geschichte des Rundfunks, Rundfunkrecht und Heinz- Werner Stuiber. Medien in Deutschland, Band 2: Rundfunk [...] 42-44. 213. „Elke Halefeldt. Unterwegs zur Medienkompetenz: Die medienpädagogische Landschaft der Bundesrepublik Deutschland. Köln: Katholisches Institut für Medieninformation, 1998.“ In: MEDIENwissenschaft:
fileadmin/content/institute/friesisch/dokumente/etc/veroeffentlichungsverzeichniskuehl-1121.pdf
114 Jørgen Kühl: Mniejszosci narodowe w Unii Europeejskiej na przykładzie mniejszosci niemieckiej w Danii, in: Perspektywy wspierania mniejszości narodowych w Polsce w kontekście przystąpienia do Unii Eu [...] regionalt selvstyre. En sammenligning af Sønderjyllands Amt (Danmark) og delstaten Slesvig-Holsten (Tyskland) / Kommunale und regionale Selbstverwaltung. Sønderjyllands Amt (Dänemark) http://www.ifg.dk/pub [...] dk/pub/2006/MHDokumente.pdf 3 und das Land Schleswig-Holstein (Deutschland) im Vergleich Bov/Aabenraa: Region Sønderjylland-Schleswig & Institut for grænseregionsforskning 2003 [52 pp.] [Local and Regional